Difference between revisions of "January 14, 2021 CPP Design Meeting ERR discussion"

From GlueXWiki
Jump to: navigation, search
(Minutes and Action Items)
(Agenda)
Line 12: Line 12:
 
           [[Media:CPP_Schedule_after_primex.pdf]]
 
           [[Media:CPP_Schedule_after_primex.pdf]]
 
* Solid Pb target support and installation [[Media:CPP_Target_pic.pdf]]  
 
* Solid Pb target support and installation [[Media:CPP_Target_pic.pdf]]  
* Beam vacuum pipe needed for the experiment. (Target is located at z=1 cm, 64 cm upstream of nominal GlueX)
 
* Relocation of CDC FADC electronics for use with the muon chamber [[Media:CPP_Electronics_enclosure.pdf]]
 
* Review that there are no interferences for the new grounding shields for the muon chamber electronics.
 
 
* Design/Procurement status
 
* Design/Procurement status
  

Revision as of 17:19, 13 January 2021

Meeting Time and Place

Thursday Jan 14, 2021, 2pm Bluejeans https://bluejeans.com/465620466

  • Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S

Agenda

          Media:CPP_Schedule_before_primex.pdf 
          Media:CPP_Schedule_after_primex.pdf
  • Things to work out
    • Gas line manifold
    • Complete structural analysis
    • Develop Detailed installation plan
    • Develop Design/operational/Maintenance Requirements
    • Modified US vacuum system
    • Solid target installation

Minutes and Action Items