Difference between revisions of "January 15, 2016 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
Line 22: Line 22:
 
# Box length and support structure plans (All)
 
# Box length and support structure plans (All)
 
# [https://gluexdirc.mit.edu/photon-yield-maps PMT coupling and photon yield maps] (Maria)
 
# [https://gluexdirc.mit.edu/photon-yield-maps PMT coupling and photon yield maps] (Maria)
# [[Planning for FY16]]
+
# [[DIRC Planning for FY16|Planning for FY16]]
 
# [[Task list from DIRC project review (October 14, 2015)|Task list]]
 
# [[Task list from DIRC project review (October 14, 2015)|Task list]]
 
# AOB
 
# AOB

Revision as of 09:38, 15 January 2016

Meeting Information

GlueX PID Upgrade Meeting
Friday, January 15, 2016
11 am, EDT
For those people at Jefferson Lab, the meeting will be in room F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. October 2015 Review Report
  3. Box length and support structure plans (All)
  4. PMT coupling and photon yield maps (Maria)
  5. Planning for FY16
  6. Task list
  7. AOB