Difference between revisions of "January 18, 2012 Tracking CDC/FDC"

From GlueXWiki
Jump to: navigation, search
(Minutes)
(Minutes)
Line 25: Line 25:
 
# Plan to address the memory bugs.
 
# Plan to address the memory bugs.
  
== Minutes ==
+
== Hardware Minutes ==
 
Participants: Curtis, Naomi, Dave, Beni, Mark, Elton, Tim, Mark, Lubomir, Simon
 
Participants: Curtis, Naomi, Dave, Beni, Mark, Elton, Tim, Mark, Lubomir, Simon
  

Revision as of 13:04, 18 January 2012

Meeting Time and Place

Wednesday January 18, 2012 at 11:00am At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone, dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Hardware Agenda

  1. Announcements
  2. FDC Update logbook, [1], [2]
  3. CDC Update

Software Agenda

  1. Tracking Software: Paul
  2. Single proton tracking File:Singleproton.pdf
  3. Discussion of metrics to measure performance.
  4. Plan to address the memory bugs.

Hardware Minutes

Participants: Curtis, Naomi, Dave, Beni, Mark, Elton, Tim, Mark, Lubomir, Simon

FDC Update

CDC Update

  1. 680 wires remain to be strung. We expect this to finish in early Feb.
  2. The techs are doing a lot of soldering practice.
  3. After finishing tension checks we plan to put ~500V on the wires (in air).
  4. The mapping plan is almost complete, we have identified which pins will go to which HVB. Most wires are 4" long (range is 3.75" to 5").
  5. Tim: aiming for cheeseplate delivery and surveying end Feb/March. Small parts (brackets) will be sent to CMU before then.