January 18, 2023 Calorimeter

From GlueXWiki
Revision as of 22:21, 18 January 2023 by Zisis (Talk | contribs) (Minutes)

Jump to: navigation, search

Meeting Day/Time: every other WEDNESDAY at 11:00 a.m. JLab time

Connection instructions

Use ZoomGov: https://jlab-org.zoomgov.com/j/1608552106?pwd=UE1nZFIzUUZHVjJEVGJXTGdUYTV3UT09.
Our meeting ID number is 160 855 2106. Click "Expand" for more details.

  • Meeting ID: 160 855 2106 Passcode: 944454
  • One tap mobile
       +16692545252,,1608552106# US (San Jose)
       +16468287666,,1608552106# US (New York)
  • Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 551 285 1373 US
       +1 669 216 1590 US (San Jose)
       833 568 8864 US Toll-free
       161.199.138.10 (US West)
       161.199.136.10 (US East)
       Meeting ID: 160 855 2106
       Passcode: 944454

References

  1. FCAL HDFCAL log book
  2. BCAL HDBCAL log book
  3. CCAL HDCCAL log book
  4. Calibrations: 2020 Data Production; RunPeriod-2019-11 Validation; Offline Monitoring Data Validation
  5. Photon Reconstruction Task Force
  6. BCAL calibration links, 2020, PrimEx, SRC

Goals for Calorimetry Group

  1. Determine preliminary photon reconstruction efficiencies as a function of E, phi and theta in data and simulation with a point-to-point precision of at least 5%.
  2. Measure systematics of pi0/eta mass calibration as a function of detector position to a precision of at least 5 MeV.
  3. Demonstrate agreement of photon resolution between data and simulation as a function of E, phi and theta to within 5%.
  4. Demonstrate agreement of photon reconstruction efficiency between data and simulation as a function of E, phi and theta to within 5%.

Action Items

  1. Short term CALWG Items
  2. Long term items
  3. Calorimeter work packages
  4. AI - BCAL Monitoring:
    1. Hydra Real-Time Dashboard
    2. Hydra 24-hr Monitoring Logs

Tentative Agenda

  1. Announcements
  2. Past Meeting Minutes
  3. Review Action Items
  4. Run Operations
    1. FCAL/FCAL2
    2. BCAL
  5. Calibration
    1. FCAL energy calibration
  6. Monitoring
  7. Reconstruction
  8. Simulations
  9. Any other business

Minutes

Attendees: Matt, Mark, Susan, Igal, Tolga, Jon, Karthik, Sasha, Malte, Varun, Zisis

  1. Announcements: none
  2. Past Meeting Minutes: no review needed
  3. Review Action Items: no review needed
  4. Run Operations
    1. FCAL/FCAL2: 25 bases changed over the break. Lockup rate of 3/ day. Malte is analyzing the results using entire PrimEx run period, looking at the archiver. The lockups are spread randomly over the FCAL face, with no noticeable concentration near the center. He uses rad508_p2 neutron detector. Checked with empty and filled target (He) but also for Be. Script exists for shift takers once a lockup is detected: entire FCAL high voltage needs to be turned off, then the script resets things. Discussions with Hovanes are ongoing to see if the detection and rest can go into the alarm handler. See modified script and lockup analysis
    2. BCAL: all in the green. Mark’s new method of pulsing will be monitored by him and Varun.
  5. Calibration
    1. FCAL energy calibration:
  6. Monitoring
  7. Reconstruction: no report
  8. Simulations: no report
  9. Any other business: none