Difference between revisions of "January 21, 2022 Tech group SAD meeting"

From GlueXWiki
Jump to: navigation, search
(Created page with "= Meeting Time and Place == Thursday January 21, 2022 at 8:00 am Hall D Counting House Zoom https://jlab-org.zoomgov.com/j/1601557064?pwd=NkF5d1BOdm1INHE4Vkw0NXpMT00rZz09&f...")
 
(Agenda)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
Thursday January 21, 2022 at 8:00 am
 
Thursday January 21, 2022 at 8:00 am
 
Hall D Counting House
 
Hall D Counting House
 +
 
Zoom    https://jlab-org.zoomgov.com/j/1601557064?pwd=NkF5d1BOdm1INHE4Vkw0NXpMT00rZz09&from=addon#success
 
Zoom    https://jlab-org.zoomgov.com/j/1601557064?pwd=NkF5d1BOdm1INHE4Vkw0NXpMT00rZz09&from=addon#success
  
 
== Agenda ==
 
== Agenda ==
 
* Safety - CPP Stand install
 
* Safety - CPP Stand install
* Hall D SAD Tasks
+
* Hall D SAD Tasks [[Media:SAD2022_Acc_schedule.pdf]]
 
** CPP INstall  O:\halld_engineering\Installation Schedules
 
** CPP INstall  O:\halld_engineering\Installation Schedules
*** Microscope move
+
*** Microscope move - Mostly completed - will need to re-install Hodoscope once tested
*** Platform mods
+
*** Platform mods - completed
 
*** Lead absorber
 
*** Lead absorber
 
*** Move Chambers to Hall for Beni/Elton to check HV on wires
 
*** Move Chambers to Hall for Beni/Elton to check HV on wires
 +
*** Bring stand to hall
 
** Solenoid Warm Up/Cool Down - 62K - lots of nitrogen liquid level alarms
 
** Solenoid Warm Up/Cool Down - 62K - lots of nitrogen liquid level alarms
 
** Goniometer Maintenance/Diamonds?
 
** Goniometer Maintenance/Diamonds?
 
** PS Parasitic Detectors stages?
 
** PS Parasitic Detectors stages?
** DIRC Ressurection
+
** DIRC Resurrection - Justin to come in Tuesday to look at test pieces
** FCAL Insert Module fabrication
+
** FCAL Insert Module fabrication ?
** Tagger NMR repair
+
** Tagger NMR repair - RMA available
 
** FDC chiller repair
 
** FDC chiller repair
 
** BCAL Coldshot Chiller commissioning
 
** BCAL Coldshot Chiller commissioning
 
** Target Turbo repair
 
** Target Turbo repair
 +
** TEDF move in late March-early April
 +
** New electric quads for PS parasitic detectors installed
 
* JT file creation
 
* JT file creation
 
* FCAL Insert Drawings
 
* FCAL Insert Drawings
Line 30: Line 34:
  
 
* NMR controller repair
 
* NMR controller repair
* Set up PS leach meeting
+
* Set up PS parasitic meeting
 
* Decide on Goni maintenance
 
* Decide on Goni maintenance
 +
* Delineate ePAS permit requests for CPP install HDList

Latest revision as of 16:01, 21 January 2022

Meeting Time and Place =

Thursday January 21, 2022 at 8:00 am Hall D Counting House

Zoom https://jlab-org.zoomgov.com/j/1601557064?pwd=NkF5d1BOdm1INHE4Vkw0NXpMT00rZz09&from=addon#success

Agenda

  • Safety - CPP Stand install
  • Hall D SAD Tasks Media:SAD2022_Acc_schedule.pdf
    • CPP INstall O:\halld_engineering\Installation Schedules
      • Microscope move - Mostly completed - will need to re-install Hodoscope once tested
      • Platform mods - completed
      • Lead absorber
      • Move Chambers to Hall for Beni/Elton to check HV on wires
      • Bring stand to hall
    • Solenoid Warm Up/Cool Down - 62K - lots of nitrogen liquid level alarms
    • Goniometer Maintenance/Diamonds?
    • PS Parasitic Detectors stages?
    • DIRC Resurrection - Justin to come in Tuesday to look at test pieces
    • FCAL Insert Module fabrication ?
    • Tagger NMR repair - RMA available
    • FDC chiller repair
    • BCAL Coldshot Chiller commissioning
    • Target Turbo repair
    • TEDF move in late March-early April
    • New electric quads for PS parasitic detectors installed
  • JT file creation
  • FCAL Insert Drawings
    • General Maintenance
  • On Call - Bobby
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items

  • NMR controller repair
  • Set up PS parasitic meeting
  • Decide on Goni maintenance
  • Delineate ePAS permit requests for CPP install HDList