Meeting Time and Place =
Thursday January 21, 2022 at 8:00 am Hall D Counting House
Zoom https://jlab-org.zoomgov.com/j/1601557064?pwd=NkF5d1BOdm1INHE4Vkw0NXpMT00rZz09&from=addon#success
Agenda
- Safety - CPP Stand install
- Hall D SAD Tasks
- CPP INstall O:\halld_engineering\Installation Schedules
- Microscope move - Mostly completed - will need to re-install Hodoscope once tested
- Platform mods - completed
- Lead absorber
- Move Chambers to Hall for Beni/Elton to check HV on wires
- Bring stand to hall
- Solenoid Warm Up/Cool Down - 62K - lots of nitrogen liquid level alarms
- Goniometer Maintenance/Diamonds?
- PS Parasitic Detectors stages?
- DIRC Resurrection - Justin to come in Tuesday to look at test pieces
- FCAL Insert Module fabrication ?
- Tagger NMR repair - RMA available
- FDC chiller repair
- BCAL Coldshot Chiller commissioning
- Target Turbo repair
- TEDF move in late March-early April
- CPP INstall O:\halld_engineering\Installation Schedules
- JT file creation
- FCAL Insert Drawings
- General Maintenance
- On Call - Bobby
- ePAS Training and trial https://www.jlab.org/esh/epas
Action Items
- NMR controller repair
- Set up PS parasitic meeting
- Decide on Goni maintenance