January 21, 2022 Tech group SAD meeting

From GlueXWiki
Revision as of 10:11, 21 January 2022 by Whitey (Talk | contribs) (Agenda)

Jump to: navigation, search

Meeting Time and Place =

Thursday January 21, 2022 at 8:00 am Hall D Counting House

Zoom https://jlab-org.zoomgov.com/j/1601557064?pwd=NkF5d1BOdm1INHE4Vkw0NXpMT00rZz09&from=addon#success

Agenda

  • Safety - CPP Stand install
  • Hall D SAD Tasks
    • CPP INstall O:\halld_engineering\Installation Schedules
      • Microscope move - Mostly completed - will need to re-install Hodoscope once tested
      • Platform mods - completed
      • Lead absorber
      • Move Chambers to Hall for Beni/Elton to check HV on wires
      • Bring stand to hall
    • Solenoid Warm Up/Cool Down - 62K - lots of nitrogen liquid level alarms
    • Goniometer Maintenance/Diamonds?
    • PS Parasitic Detectors stages?
    • DIRC Resurrection - Justin to come in Tuesday to look at test pieces
    • FCAL Insert Module fabrication ?
    • Tagger NMR repair - RMA available
    • FDC chiller repair
    • BCAL Coldshot Chiller commissioning
    • Target Turbo repair
    • TEDF move in late March-early April
    • New electric quads for PS parasitic detectors installed
  • JT file creation
  • FCAL Insert Drawings
    • General Maintenance
  • On Call - Bobby
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items

  • NMR controller repair
  • Set up PS parasitic meeting
  • Decide on Goni maintenance