(Agenda)
Line 21: Line 21:
 
# Bar box transportation
 
# Bar box transportation
 
#* Planning for final 3 bar boxes
 
#* Planning for final 3 bar boxes
#** Monitoring System
+
#** Crate shipment to IU and construction plans
 
#** Dates to discuss with SLAC
 
#** Dates to discuss with SLAC
 
# Optical box
 
# Optical box
 +
#* Plan for engineering meetings (alternate Thursdays with this meeting)
 
#* Status update (Ernie and Jason)
 
#* Status update (Ernie and Jason)
#** Box production at Lesker: final production drawings
+
#** Box production at Lesker: final production drawings (?)
 
#** PMT test fixture
 
#** PMT test fixture
 
#** Other items and quotes
 
#** Other items and quotes
 
#** Followup on questions to drawing package(?): [https://www.dropbox.com/s/rvsubsp62145w6x/GLUEX%20FOB%20MK2%20BOX%20WELDMENT%20LH.STEP?dl=0 STEP file]
 
#** Followup on questions to drawing package(?): [https://www.dropbox.com/s/rvsubsp62145w6x/GLUEX%20FOB%20MK2%20BOX%20WELDMENT%20LH.STEP?dl=0 STEP file]
#* Simulation studies (Maria and Roman)
+
# Simulation studies (Maria and Roman)
 
# MAPMT testing (Bill)
 
# MAPMT testing (Bill)
 
# AOB
 
# AOB

Revision as of 09:23, 25 January 2018

Meeting Information

GlueX DIRC Meeting
Thursday January 25, 2018
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Support structure update (John, Tim, Tom)
    • Roll fixture testing
  3. Bar box transportation
    • Planning for final 3 bar boxes
      • Crate shipment to IU and construction plans
      • Dates to discuss with SLAC
  4. Optical box
    • Plan for engineering meetings (alternate Thursdays with this meeting)
    • Status update (Ernie and Jason)
      • Box production at Lesker: final production drawings (?)
      • PMT test fixture
      • Other items and quotes
      • Followup on questions to drawing package(?): STEP file
  5. Simulation studies (Maria and Roman)
  6. MAPMT testing (Bill)
  7. AOB