Difference between revisions of "January 25, 2018 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(One intermediate revision by one other user not shown)
Line 27: Line 27:
 
#* Status update (Ernie and Jason)
 
#* Status update (Ernie and Jason)
 
#** Box production at Lesker: final production drawings (?)
 
#** Box production at Lesker: final production drawings (?)
#** PMT test fixture: [https://drive.google.com/file/d/12aEfACnLaRJrLX0ruBd0f5Cwa5G2Jyx-/view PMT test]
+
#** PMT test fixture
 
#** Other items and quotes
 
#** Other items and quotes
#** Followup on questions to drawing package(?): [https://www.dropbox.com/s/rvsubsp62145w6x/GLUEX%20FOB%20MK2%20BOX%20WELDMENT%20LH.STEP?dl=0 STEP file]
+
#** Followup on questions to drawing package (postpone to engineering meetings?): [https://www.dropbox.com/s/rvsubsp62145w6x/GLUEX%20FOB%20MK2%20BOX%20WELDMENT%20LH.STEP?dl=0 STEP file]
 
# Simulation studies (Maria and Roman):  [https://web-docs.gsi.de/~rdzhigad/www/research/geometrical-reco-gluex geometrical reconstruction]
 
# Simulation studies (Maria and Roman):  [https://web-docs.gsi.de/~rdzhigad/www/research/geometrical-reco-gluex geometrical reconstruction]
# MAPMT testing (Bill)
+
# MAPMT testing (Bill): [https://halldweb.jlab.org/wiki/images/8/82/12700_PMT_test_25_Han_2018.pdf PMT test]
 
# AOB
 
# AOB

Latest revision as of 10:51, 25 January 2018

Meeting Information

GlueX DIRC Meeting
Thursday January 25, 2018
10:00 am, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Support structure update (John, Tim, Tom)
    • Roll fixture testing
  3. Bar box transportation
    • Crate shipment to IU and construction plans
    • Dates to discuss with SLAC
  4. Optical box
    • Plan for engineering meetings (Bates+JLab: alternate Thursdays with this meeting)
    • Status update (Ernie and Jason)
      • Box production at Lesker: final production drawings (?)
      • PMT test fixture
      • Other items and quotes
      • Followup on questions to drawing package (postpone to engineering meetings?): STEP file
  5. Simulation studies (Maria and Roman): geometrical reconstruction
  6. MAPMT testing (Bill): PMT test
  7. AOB