Difference between revisions of "January 28, 2021 CPP Design Meeting/ERR discussion"

From GlueXWiki
Jump to: navigation, search
(Minutes and Action Items)
Line 29: Line 29:
  
 
== Minutes and Action Items ==
 
== Minutes and Action Items ==
* ERR discussed - 3 talks to address charge questions
 
** Decided to use schedule with CPP run first then Primex - keep other as backup
 
* Target Discussion
 
** Rory has target from previous experiment we will use (lead)
 
** Need manual insertion of lead and empty target with good precision (change 1X per day)
 
** Need vacuum right up to target (thin kapton window -125 microns)
 
** Desire helium bag inside CDC
 
** Need to develop design for target change out that can be done quickly and precisely
 
** Target location 64 cm US of existing target (Hall D 1 cm US of 0,0)
 
** Vacuum system needs to be designed -continue 1.5 inch tube
 
* Need to develop talks for CPP review to address charge
 

Revision as of 12:47, 28 January 2021

Meeting Time and Place

Thursday Jan 14, 2021, 2pm Bluejeans https://bluejeans.com/465620466

  • Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S

Agenda

          Media:CPP_Schedule_before_primex_v2.pdf 
          Media:CPP_Schedule_after_primex.pdf
  • Things to work out
    • Gas line manifold
    • Complete structural analysis
    • Develop Detailed installation plan
    • Develop Design/operational/Maintenance Requirements
    • Modified US vacuum system
    • Solid target installation
    • Documentation for ERR
    • Microscope move

Minutes and Action Items