Difference between revisions of "January 29, 2016 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
 
(One intermediate revision by the same user not shown)
Line 20: Line 20:
 
#* [[GlueX-Collaboration-Feb-2016|Collaboration Meeting Feb 18-20]]
 
#* [[GlueX-Collaboration-Feb-2016|Collaboration Meeting Feb 18-20]]
 
# Box length and support structure plans (All)
 
# Box length and support structure plans (All)
# Electronics Update (Fernando/Justin)
+
# Electronics update (Fernando/Justin)
# [https://halldweb.jlab.org/wiki/index.php/File:Reconstructionupdata012916.pdf | Reconstruction updates (John)]
+
# [https://halldweb.jlab.org/wiki/images/6/6f/CartoonDIRC.pdf Optical box constraints] (Maria)
 +
# [https://halldweb.jlab.org/wiki/index.php/File:Reconstructionupdata012916.pdf Reconstruction updates (John)]
 
# [[DIRC Planning for FY16|Planning for FY16]]
 
# [[DIRC Planning for FY16|Planning for FY16]]
 
# Next meeting: Feb 12?
 
# Next meeting: Feb 12?
 
# AOB
 
# AOB

Latest revision as of 11:43, 29 January 2016

Meeting Information

GlueX PID Upgrade Meeting
Friday, January 15, 2016
11 am, EDT
For those people at Jefferson Lab, the meeting will be in room F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.


  1. Announcements
  2. Box length and support structure plans (All)
  3. Electronics update (Fernando/Justin)
  4. Optical box constraints (Maria)
  5. Reconstruction updates (John)
  6. Planning for FY16
  7. Next meeting: Feb 12?
  8. AOB