Difference between revisions of "January 4, 2021 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 22: Line 22:
 
#* Discussion of prototypes and ongoing tests: [https://logbooks.jlab.org/entry/3861212 December 28] [https://logbooks.jlab.org/entry/3861362 Today]
 
#* Discussion of prototypes and ongoing tests: [https://logbooks.jlab.org/entry/3861212 December 28] [https://logbooks.jlab.org/entry/3861362 Today]
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4828 Reflectivity measurements] (Justin/Bill)
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4828 Reflectivity measurements] (Justin/Bill)
 +
#* Order placed today for 3 additional sheets of UVE mirror (enough for both OBs), borosilicate still needed once assembly is finalized
 
#* Other thoughts or suggestions?
 
#* Other thoughts or suggestions?
 
# Diffuser status (Bill)
 
# Diffuser status (Bill)

Revision as of 13:37, 4 January 2021

Meeting Information

GlueX DIRC Meeting
Monday January 4, 2021
1:00 pm, ET
Remote only

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Mirror prototype test plan (All)
    • Discussion of prototypes and ongoing tests: December 28 Today
    • Reflectivity measurements (Justin/Bill)
    • Order placed today for 3 additional sheets of UVE mirror (enough for both OBs), borosilicate still needed once assembly is finalized
    • Other thoughts or suggestions?
  3. Diffuser status (Bill)
  4. Module replacement strategy (Bill)
  5. DIRC commissioning analyses and 2020 studies (All)
  6. AOB