Difference between revisions of "January 4, 2021 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 24: Line 24:
 
#* Order placed today for 3 additional sheets of UVE mirror (enough for both OBs), borosilicate still needed once assembly is finalized
 
#* Order placed today for 3 additional sheets of UVE mirror (enough for both OBs), borosilicate still needed once assembly is finalized
 
#* Other thoughts or suggestions?
 
#* Other thoughts or suggestions?
# Diffuser status (Bill)
+
# [https://logbooks.jlab.org/entry/3861383 Diffuser status] (Bill)
 
# [https://logbooks.jlab.org/entry/3860930 Module replacement strategy] (Bill)
 
# [https://logbooks.jlab.org/entry/3860930 Module replacement strategy] (Bill)
 
# DIRC commissioning analyses and 2020 studies (All)
 
# DIRC commissioning analyses and 2020 studies (All)

Latest revision as of 14:54, 4 January 2021

Meeting Information

GlueX DIRC Meeting
Monday January 4, 2021
1:00 pm, ET
Remote only

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Mirror prototype test plan (All)
    • Discussion of prototypes and ongoing tests: December 28 Today
    • Reflectivity measurements (Justin/Bill)
    • Order placed today for 3 additional sheets of UVE mirror (enough for both OBs), borosilicate still needed once assembly is finalized
    • Other thoughts or suggestions?
  3. Diffuser status (Bill)
  4. Module replacement strategy (Bill)
  5. DIRC commissioning analyses and 2020 studies (All)
  6. AOB