Difference between revisions of "January 6, 2020 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday January 6, 2029<br> 1:00 pm, EDT<br> CC F326 <br> == Connection Using Bluejeans == # To join via Polycom room system...") |
(→Agenda) |
||
Line 18: | Line 18: | ||
# Announcements: | # Announcements: | ||
#* Instr2020 abstract (Bill) | #* Instr2020 abstract (Bill) | ||
− | #* DIRCfest 2020 | + | # Meetings: |
+ | #* Is the current meeting time OK for this semester? | ||
+ | #* Could we schedule a DIRC "workfest" (i.e. DIRCfest) for this spring? | ||
+ | #** Goal: provide DIRC reconstruction algorithm and calibrations for data production campaign in Summer 2020 | ||
+ | #** Possibly schedule around visit by GSI folks | ||
# Spring 2020 preparation | # Spring 2020 preparation | ||
#* North OB inspection | #* North OB inspection |
Revision as of 11:48, 3 January 2020
Meeting Information
GlueX DIRC Meeting
Monday January 6, 2029
1:00 pm, EDT
CC F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- Instr2020 abstract (Bill)
- Meetings:
- Is the current meeting time OK for this semester?
- Could we schedule a DIRC "workfest" (i.e. DIRCfest) for this spring?
- Goal: provide DIRC reconstruction algorithm and calibrations for data production campaign in Summer 2020
- Possibly schedule around visit by GSI folks
- Spring 2020 preparation
- North OB inspection
- HV board swap
- Water level sensors
- 2019 commissioning review
- Spring 2019 DIRC Commissioning Analysis (All)
- Fall 2019 Commissioning Analysis (All)
- Latest data files:
- dirc_tree files: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver01/hists/merged/
- DIRC LED skims: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver01/DIRC-LED/
- REST files: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver01/REST/
- Commissioning LUT analyses (All)
- Cherenkov ring fit (Roman)
- Commissioning Analyses Update (Ahmed)
- Commissioning FastDIRC update (Yunjie)
- AOB