Difference between revisions of "January 6, 2020 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 17: Line 17:
  
 
# Announcements:
 
# Announcements:
#* Instr2020 abstract (Bill)
+
#* [https://mailman.jlab.org/pipermail/halld-pid-upgrade/2019-December/000473.html Instr2020 abstract submitted] (Bill)
 
# Spring 2020 preparation
 
# Spring 2020 preparation
 
#* North OB inspection  
 
#* North OB inspection  

Revision as of 12:17, 3 January 2020

Meeting Information

GlueX DIRC Meeting
Monday January 6, 2029
1:00 pm, EDT
CC F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
  2. Spring 2020 preparation
    • North OB inspection
    • High speed network card (ongoing)
    • HV board swap
    • Water level sensors
  3. 2019 commissioning review
    • Spring 2019 DIRC Commissioning Analysis (All)
    • Fall 2019 Commissioning Analysis (All)
    • Latest data files:
      • dirc_tree files: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver01/hists/merged/
      • DIRC LED skims: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver01/DIRC-LED/
      • REST files: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver01/REST/
    • Commissioning LUT analyses (All)
      • Cherenkov ring fit (Roman)
      • Commissioning Analyses Update (Ahmed)
    • Commissioning FastDIRC update (Yunjie)
  4. Meetings:
    • Is the current meeting time OK for this semester?
    • Could we schedule a DIRC "workfest" (i.e. DIRCfest) for later this Spring?
      • Goal 1: provide DIRC reconstruction algorithm and calibrations for data production campaign in Summer 2020.
      • Goal 2: performance plots and conclusions for PAC jeopardy and DIRC NIM article
      • Requires significant work beforehand. Possibly schedule around Collaboration Meeting after the run: May 4-6
  5. AOB