Difference between revisions of "January 6, 2020 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
(8 intermediate revisions by 2 users not shown)
Line 3: Line 3:
 
Monday January 6, 2029<br>
 
Monday January 6, 2029<br>
 
1:00 pm, EDT<br>
 
1:00 pm, EDT<br>
CC F326 <br>
+
Hall D Counting House <br>
  
 
== Connection Using Bluejeans ==
 
== Connection Using Bluejeans ==
Line 17: Line 17:
  
 
# Announcements:
 
# Announcements:
 +
#* Accelerator making good progress to restore beam, locking up hall this afternoon
 
#* [https://mailman.jlab.org/pipermail/halld-pid-upgrade/2019-December/000473.html Instr2020 abstract submitted] (Bill)
 
#* [https://mailman.jlab.org/pipermail/halld-pid-upgrade/2019-December/000473.html Instr2020 abstract submitted] (Bill)
 +
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-Feb-2020 Collaboration Meeting Feb 13-15]: volunteers for DIRC talk?
 
# Spring 2020 preparation
 
# Spring 2020 preparation
 
#* [https://logbooks.jlab.org/entry/3758003 North OB inspection complete]
 
#* [https://logbooks.jlab.org/entry/3758003 North OB inspection complete]
#* High speed network card (ongoing)
+
#* High speed network card: [https://logbooks.jlab.org/entry/3758432 initial test], achieved ~110 MB/s with [https://logbooks.jlab.org/entry/3759093 HL configuration]
#* HV board swap
+
#* HV board swap (Hovanes, ongoing)
#* Water level sensors
+
#* Water level sensors (wait for later access)
 
# 2019 commissioning review
 
# 2019 commissioning review
 
#* [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
#* [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
#* [[Fall 2019 DIRC Commissioning|Fall 2019 Commissioning Analysis]] (All)
 
#* [[Fall 2019 DIRC Commissioning|Fall 2019 Commissioning Analysis]] (All)
 +
#* [Latest LED runs with different configurations https://logbooks.jlab.org/entry/3756918]: DDIRCLEDRef time working with latest halld_recon master.
 
#* Latest data files:
 
#* Latest data files:
 
#** dirc_tree files: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver01/hists/merged/
 
#** dirc_tree files: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver01/hists/merged/
Line 37: Line 40:
 
#* [https://logbooks.jlab.org/entry/3757897 Bar-by-bar diagnostics]
 
#* [https://logbooks.jlab.org/entry/3757897 Bar-by-bar diagnostics]
 
#* Standalone LUT update (Ahmed/Roman)  
 
#* Standalone LUT update (Ahmed/Roman)  
#* FastDIRC update (Yunjie)
+
#* [https://halldweb.jlab.org/wiki/images/7/79/FastDIRC_010620.pdf FastDIRC update] (Yunjie)
 
#* Update on kaon track timing issue (Justin)
 
#* Update on kaon track timing issue (Justin)
 +
#** Short answer: the kaon timing is fixed for the dirc_monitoring/ver01 files in the paths given above, but further improvements to kaon tracking are likely needed.
 
# Meetings:
 
# Meetings:
 
#* Is the current meeting time OK for this semester?
 
#* Is the current meeting time OK for this semester?

Latest revision as of 13:55, 6 January 2020

Meeting Information

GlueX DIRC Meeting
Monday January 6, 2029
1:00 pm, EDT
Hall D Counting House

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
  2. Spring 2020 preparation
  3. 2019 commissioning review
    • Spring 2019 DIRC Commissioning Analysis (All)
    • Fall 2019 Commissioning Analysis (All)
    • [Latest LED runs with different configurations https://logbooks.jlab.org/entry/3756918]: DDIRCLEDRef time working with latest halld_recon master.
    • Latest data files:
      • dirc_tree files: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver01/hists/merged/
      • DIRC LED skims: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver01/DIRC-LED/
      • REST files: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver01/REST/
    • Commissioning analyses (All)
    • Bar-by-bar diagnostics
    • Standalone LUT update (Ahmed/Roman)
    • FastDIRC update (Yunjie)
    • Update on kaon track timing issue (Justin)
      • Short answer: the kaon timing is fixed for the dirc_monitoring/ver01 files in the paths given above, but further improvements to kaon tracking are likely needed.
  4. Meetings:
    • Is the current meeting time OK for this semester?
    • Could we schedule a DIRC "workfest" (i.e. DIRCfest) for later this Spring?
      • Goal 1: provide DIRC reconstruction algorithm and calibrations for data production campaign in Summer 2020.
      • Goal 2: performance plots and conclusions for PAC jeopardy and DIRC NIM article
      • Requires significant work beforehand. Possibly schedule around Collaboration Meeting after the run: May 4-6
  5. AOB