# Installation status (All)
 
# Installation status (All)
 +
#* [https://logbooks.jlab.org/entry/3640873 Before holiday shutdown] (Tim)
 
#* Upper bar boxes installed (Matt, Tim)
 
#* Upper bar boxes installed (Matt, Tim)
 
#* Dark box enclosure light tightness and cooling tests (All)
 
#* Dark box enclosure light tightness and cooling tests (All)
#* Quartz window RTV'd for lower box and delivery to JLab Monday, upper box arrives later this week (Ernie)
+
#** [https://logbooks.jlab.org/entry/3640620 Cooling test]
#* LED fiber feedthroughs installation (Bill)
+
#** [https://logbooks.jlab.org/entry/3641311 Light tightness test]
 +
#* Quartz window RTV'd for lower box and delivery to JLab on Monday, upper box window to be installed next Monday (Ernie)
 +
#* LED fiber feedthroughs installation (Bill, Kieth)
 
# Software/simulations
 
# Software/simulations
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie)
+
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
 
#* LED generator and timing calibration (Yunjie)
 
#* LED generator and timing calibration (Yunjie)
 
#* Time-based studies and adding # photons to LUT likelihood (Maria)
 
#* Time-based studies and adding # photons to LUT likelihood (Maria)
Line 30: Line 33:
 
#* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
#* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
#** Many recent updates to '''dirc_commissioning_2018''' branches, expect to go on master later on Wednesday
 
#** Many recent updates to '''dirc_commissioning_2018''' branches, expect to go on master later on Wednesday
 +
# [[Spring 2019 DIRC Commissioning]] (All)
 
# [[Addressing ERR review recommendations]]
 
# [[Addressing ERR review recommendations]]
 
# AOB
 
# AOB

Latest revision as of 13:02, 7 January 2019

Meeting Information

GlueX DIRC Meeting
Monday January 7, 2019
1:00 pm, EDT
JLab Hall D counting house

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Installation status (All)
    • Before holiday shutdown (Tim)
    • Upper bar boxes installed (Matt, Tim)
    • Dark box enclosure light tightness and cooling tests (All)
    • Quartz window RTV'd for lower box and delivery to JLab on Monday, upper box window to be installed next Monday (Ernie)
    • LED fiber feedthroughs installation (Bill, Kieth)
  3. Software/simulations
    • Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
    • LED generator and timing calibration (Yunjie)
    • Time-based studies and adding # photons to LUT likelihood (Maria)
    • Alignment updates (Cris)
    • Software overview and tasks (All)
      • Many recent updates to dirc_commissioning_2018 branches, expect to go on master later on Wednesday
  4. Spring 2019 DIRC Commissioning (All)
  5. Addressing ERR review recommendations
  6. AOB