(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday January 7, 2019<br> 1:00 pm, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Polycom room s...")
 
(Agenda)
Line 19: Line 19:
 
#* New meeting time for Spring semester: [https://doodle.com/poll/pg2ftbus32yfe67c Doodle poll]
 
#* New meeting time for Spring semester: [https://doodle.com/poll/pg2ftbus32yfe67c Doodle poll]
 
# Installation status (All)
 
# Installation status (All)
#** Upper bar boxes installed (Matt, Tim)
+
#* Upper bar boxes installed (Matt, Tim)
#** Dark box enclosure light tightness and cooling tests (All)
+
#* Dark box enclosure light tightness and cooling tests (All)
#** Quartz window RTV'd for lower box and delivery to JLab Monday, upper box arrives later this week (Ernie)
+
#* Quartz window RTV'd for lower box and delivery to JLab Monday, upper box arrives later this week (Ernie)
#** LED fiber feedthroughs installation (Bill)
+
#* LED fiber feedthroughs installation (Bill)
 
# Software/simulations
 
# Software/simulations
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie)
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie)

Revision as of 23:35, 5 January 2019

Meeting Information

GlueX DIRC Meeting
Monday January 7, 2019
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Installation status (All)
    • Upper bar boxes installed (Matt, Tim)
    • Dark box enclosure light tightness and cooling tests (All)
    • Quartz window RTV'd for lower box and delivery to JLab Monday, upper box arrives later this week (Ernie)
    • LED fiber feedthroughs installation (Bill)
  3. Software/simulations
    • Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie)
    • LED generator and timing calibration (Yunjie)
    • Time-based studies and adding # photons to LUT likelihood (Maria)
    • Alignment updates (Cris)
    • Software overview and tasks (All)
      • Many recent updates to dirc_commissioning_2018 branches, expect to go on master later on Wednesday
  4. Addressing ERR review recommendations
  5. AOB