Difference between revisions of "January 7, 2019 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday January 7, 2019<br> 1:00 pm, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Polycom room s...") |
(→Agenda) |
||
Line 19: | Line 19: | ||
#* New meeting time for Spring semester: [https://doodle.com/poll/pg2ftbus32yfe67c Doodle poll] | #* New meeting time for Spring semester: [https://doodle.com/poll/pg2ftbus32yfe67c Doodle poll] | ||
# Installation status (All) | # Installation status (All) | ||
− | # | + | #* Upper bar boxes installed (Matt, Tim) |
− | # | + | #* Dark box enclosure light tightness and cooling tests (All) |
− | # | + | #* Quartz window RTV'd for lower box and delivery to JLab Monday, upper box arrives later this week (Ernie) |
− | # | + | #* LED fiber feedthroughs installation (Bill) |
# Software/simulations | # Software/simulations | ||
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie) | #* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie) |
Revision as of 23:35, 5 January 2019
Meeting Information
GlueX DIRC Meeting
Monday January 7, 2019
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- New meeting time for Spring semester: Doodle poll
- Installation status (All)
- Upper bar boxes installed (Matt, Tim)
- Dark box enclosure light tightness and cooling tests (All)
- Quartz window RTV'd for lower box and delivery to JLab Monday, upper box arrives later this week (Ernie)
- LED fiber feedthroughs installation (Bill)
- Software/simulations
- Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie)
- LED generator and timing calibration (Yunjie)
- Time-based studies and adding # photons to LUT likelihood (Maria)
- Alignment updates (Cris)
- Software overview and tasks (All)
- Many recent updates to dirc_commissioning_2018 branches, expect to go on master later on Wednesday
- Addressing ERR review recommendations
- AOB