Difference between revisions of "July 08, 2021 KLONG Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 21: Line 21:
 
** Cool tungsten plug to below temperature that affects lead (327°C)
 
** Cool tungsten plug to below temperature that affects lead (327°C)
 
** 6 cm beam tube near final target
 
** 6 cm beam tube near final target
 +
** Moveable out of beamline
  
 
== Minutes and Action Items ==
 
== Minutes and Action Items ==
  
 
== Action Items ==
 
== Action Items ==

Revision as of 08:42, 8 July 2021

Meeting Time and Place

Thursday July 08, 2021, 1pm Bluejeans https://bluejeans.com/465620466

  • Present - Hovanes Egiyan, Moskov Amaryan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Mark Stevens

Agenda

  • Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/June_10,_2021_KLONG_Design_Meeting
  • Media:KLONG_Be_target_overall.pdf
  • Existing PS vacuum chamber 5 cm high, entrance tube 3.5 cm round ID
  • Tungsten cooling
  • Preliminary 3D Model
    • Support/rollers
    • Tungsten cooling
    • 7 cm tube downstream to allow cooling tubes for tungsten
    • Be target holder
    • lead geometry
    • Borated Poly geometry
  • Heat absorbed by Be and Tungsten
  • Requirements:
    • Cool tungsten plug to below temperature that affects lead (327°C)
    • 6 cm beam tube near final target
    • Moveable out of beamline

Minutes and Action Items

Action Items