+ | * We discussed the beampipe downstream of the beryllium target. Currently there is a 3.5 cm opening in the pipe going into the Pair Spectrometer magnet. Since the beam spot size on the beryllium is about 4 cm, the PS vacuum chamber would need to be replaced with a 6cm opening beam pipe and be at least 6 cm downstream of this. | ||
== Action Items == | == Action Items == |
Revision as of 16:08, 21 July 2021
Meeting Time and Place
Thursday July 08, 2021, 1pm Bluejeans https://bluejeans.com/465620466
- Present - Hovanes Egiyan, Moskov Amaryan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Mark Stevens
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/June_24,_2021_KLONG_Design_Meeting
- Media:KLONG_Be_target_overall.pdf
- Existing PS vacuum chamber 5 cm high, entrance tube 3.5 cm round ID, magnet gap - 7 cm
- Tungsten cooling
- Preliminary 3D Model
- Support/rollers
- Tungsten cooling
- 7 cm tube downstream to allow cooling tubes for tungsten
- Be target holder
- lead geometry
- Borated Poly geometry
- Heat absorbed by Be and Tungsten (.6kw and 6Kw respectively)
- Requirements:
- Cool tungsten plug to below temperature that affects lead (327°C)
- 6 cm beam tube near final target
- Moveable out of beamline
- Be 98% pure or better
Minutes and Action Items
- We discussed the beampipe downstream of the beryllium target. Currently there is a 3.5 cm opening in the pipe going into the Pair Spectrometer magnet. Since the beam spot size on the beryllium is about 4 cm, the PS vacuum chamber would need to be replaced with a 6cm opening beam pipe and be at least 6 cm downstream of this.