Difference between revisions of "July 15, 2016 DIRC Engineering"

From GlueXWiki
Jump to: navigation, search
Line 19: Line 19:
 
# Support structure
 
# Support structure
 
#* Latest [https://halldweb.jlab.org/wiki/index.php/File:DIRC_FRAME_DISCUSSION_7.pptx slides] from John and [https://iu.box.com/s/fjh4llfy2twd1skhh4sgx1rz0ij4lqez STEP file]
 
#* Latest [https://halldweb.jlab.org/wiki/index.php/File:DIRC_FRAME_DISCUSSION_7.pptx slides] from John and [https://iu.box.com/s/fjh4llfy2twd1skhh4sgx1rz0ij4lqez STEP file]
#* Stephanie's screenshots: [[File:Full Assy Front-retracted.pdf]][[File:Full Assy Front.pdf]]
+
#* Stephanie's screenshots: [[File:Full Assy Front-retracted.pdf]|1][[File:Full Assy Front.pdf|2]]
 
#* Review action items from previous meetings
 
#* Review action items from previous meetings
 
#* Support requirements for optical boxes
 
#* Support requirements for optical boxes

Revision as of 10:41, 15 July 2016

Meeting Information

GlueX DIRC Engineering Meeting
Friday, July 15, 2016
11 am, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Support structure
    • Latest slides from John and STEP file
    • Stephanie's screenshots: [[File:Full Assy Front-retracted.pdf]|1]File:Full Assy Front.pdf
    • Review action items from previous meetings
    • Support requirements for optical boxes
    • Statement of Work to procurement after signatures DocDB
  3. Optical box design
    • Agreement from Rolf and Patrizia to start full contract for both optical boxes in FY16
  4. Installation plan File:DIRC Installation Steps in Hall D.docx
  5. AOB