Difference between revisions of "July 17, 2009 CDC Meeting"

From GlueXWiki
Jump to: navigation, search
 
Line 16: Line 16:
  
 
#CDC Hardware costs [http://www.jlab.org/~whitey/Hall%20D/CDC/Component%20costs.xlsx Costs]
 
#CDC Hardware costs [http://www.jlab.org/~whitey/Hall%20D/CDC/Component%20costs.xlsx Costs]
#Review open issues from last meeting
+
#Action Items
 +
* Checked IDEAL tool and manufacturing in Chicago. No listing
 +
* Tim to discuss with vendor repair of end plates if hole messed up
 +
* Carnegie Mellon to use GARFIELD to check electric field around crimp pin insert
 +
* Conductive rubber tubes cover 30% of gas holes - ok
 +
* Add holes for 1/4 inch survey balls in top downstream plete to match upstream (2 at 90°)
 +
* CM to send list of glues
 +
* JLAB to specify glue for rohacel to mylar joint
  
  

Revision as of 16:03, 17 July 2009

Meeting Time and Place

Friday July 17, 2009 at 2:30pm At Jefferson Lab, the meeting will be held in room ARC 428

Connections

To connect from the outside, please use ESNET
1.) ESNET: 8542553
2.) Phone:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
then enter participant code: 77438230# (remember the "#")

Agenda

  1. CDC Hardware costs Costs
  2. Action Items
  • Checked IDEAL tool and manufacturing in Chicago. No listing
  • Tim to discuss with vendor repair of end plates if hole messed up
  • Carnegie Mellon to use GARFIELD to check electric field around crimp pin insert
  • Conductive rubber tubes cover 30% of gas holes - ok
  • Add holes for 1/4 inch survey balls in top downstream plete to match upstream (2 at 90°)
  • CM to send list of glues
  • JLAB to specify glue for rohacel to mylar joint



Notes