Difference between revisions of "July 17, 2009 CDC Meeting"

From GlueXWiki
Jump to: navigation, search
Line 20: Line 20:
  
 
#Action Items/Decisions
 
#Action Items/Decisions
 +
* Discussed high prices for tight tolerance components
 
* Checked IDEAL tool and manufacturing in Chicago. No listing
 
* Checked IDEAL tool and manufacturing in Chicago. No listing
 
* Tim to discuss with vendor repair of end plates if hole messed up
 
* Tim to discuss with vendor repair of end plates if hole messed up

Revision as of 16:07, 17 July 2009

Meeting Time and Place

Friday July 17, 2009 at 2:30pm At Jefferson Lab, the meeting will be held in room ARC 428

Connections

To connect from the outside, please use ESNET
1.) ESNET: 8542553
2.) Phone:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
then enter participant code: 77438230# (remember the "#")

Agenda

  1. CDC Hardware costs Costs

Minutes

  1. Action Items/Decisions
  • Discussed high prices for tight tolerance components
  • Checked IDEAL tool and manufacturing in Chicago. No listing
  • Tim to discuss with vendor repair of end plates if hole messed up
  • Carnegie Mellon to use GARFIELD to check electric field around crimp pin insert
  • CMU to look over to see if piece tolerances can be loosened to ± .001 in
  • OK if we open end plate to .005 tolerance on hole positions, need to reduce straw diameter to prevent interferences
  • Conductive rubber tubes cover 30% of gas holes - ok
  • Add holes for 1/4 inch survey balls in top downstream plete to match upstream (2 at 90°)
  • CMU to send list of glues
  • JLAB to specify glue for rohacel to mylar joint



Notes