#* Requirements for mechanical install of optical box: [[Media:Aug10_OB_delivery.pdf|Aug 10 installation schedule]] delivery required by August 10
 
#* Requirements for mechanical install of optical box: [[Media:Aug10_OB_delivery.pdf|Aug 10 installation schedule]] delivery required by August 10
 
# Mirror box laser alignment
 
# Mirror box laser alignment
#* Update on geometry and laser projections (Bill)
+
#* [https://halldweb.jlab.org/DocDB/0035/003581/002/2018_July_19.pdf Update on geometry and laser projections] (Bill)
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3521 Optical Box Alignment strawman] (Tim)
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3521 Optical Box Alignment strawman] (Tim)
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3578 Laser Alignment fixture] (Tim)
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3578 Laser Alignment fixture] (Tim)
 
# AOB
 
# AOB

Revision as of 09:24, 19 July 2018

Meeting Information

GlueX DIRC Optical Box Meeting
Thursday July 19, 2018
10:00 am, EST
JLab A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcement
  2. Optical box status
    • Fabrication status update (Ernie and Jason)
      • Box production at Lesker
      • Mirror strong back delivery and assembly
      • Mirror cutting
      • Window procurement
      • Assembly sequence and testing plans at Bates
      • Dark box enclosure development: air flow calculations
    • DIRC BBox Split Flange Seal (Jim/Tim)
  3. Installation schedule discussion:
  4. Mirror box laser alignment