Difference between revisions of "July 21, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 22: Line 22:
 
#* BCAL Number of optical photons, see pages 4-7 of  [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=808 GlueX-doc-808]
 
#* BCAL Number of optical photons, see pages 4-7 of  [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=808 GlueX-doc-808]
 
#* Pi0 and eta mass resolution [[Media:Pi0eta mass resol.png | Physics and Calorimeter Performance Metrics Fig. 10]]
 
#* Pi0 and eta mass resolution [[Media:Pi0eta mass resol.png | Physics and Calorimeter Performance Metrics Fig. 10]]
# Reconstruction work is pending -- see 3D-rendering of geometries in the links below.
+
# Reports
#* [[Media:bcal_4x6.pdf| BCAL 4x6 readout]]
+
#* Geometry updates (Beni)
#* [[Media:bcal_3x3.pdf| BCAL 3x3 readout]]
+
#* Shower reconstruction (IU)
#* [[Media:det_cabling.pdf| BCAL, CDC, FDC cables]]
+
#* [[Media:bcal_cdc_gap.pdf| Gap between BCAL and CDC]]
+
 
# Updates
 
# Updates
 
#* Calibration system
 
#* Calibration system

Revision as of 13:22, 18 July 2008

Connection

  • The meeting will be held at 10:30 am ET
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: July 7, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)
  3. Schedule

Agenda

  1. References for the Alternative readout
  2. Reports
    • Geometry updates (Beni)
    • Shower reconstruction (IU)
  3. Updates
    • Calibration system
    • FCAL
    • BCAL
      • preparations for fiber testing
      • SiPM
  4. Any other business

Minutes