Difference between revisions of "July 23, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 24: Line 24:
 
#** Tests of composition from oxidized surfaces (Eugene/[https://halldweb.jlab.org/DocDB/0035/003581/002/2019_July_23_DIRC_Meeting_chemical_composition_analysis.pdf Bill])
 
#** Tests of composition from oxidized surfaces (Eugene/[https://halldweb.jlab.org/DocDB/0035/003581/002/2019_July_23_DIRC_Meeting_chemical_composition_analysis.pdf Bill])
 
#* Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
 
#* Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
#** [[https://logbooks.jlab.org/entry/3708280 Results from UV enhanced mirror in water sample with DP190]
+
#** [https://logbooks.jlab.org/entry/3708280 Results from UV enhanced mirror in water sample with DP190]
 
#* Next steps:
 
#* Next steps:
 
#** Receive remaining UV enhanced mirror from Bates and have cut for additional sample pieces (Wednesday 7/24)
 
#** Receive remaining UV enhanced mirror from Bates and have cut for additional sample pieces (Wednesday 7/24)

Latest revision as of 12:54, 23 July 2019

Meeting Information

GlueX DIRC Meeting
Tuesday July 23, 2019
1:00 pm, EDT
JLab F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Installation work:
    • Mirror studies:
    • Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
    • Next steps:
      • Receive remaining UV enhanced mirror from Bates and have cut for additional sample pieces (Wednesday 7/24)
      • Decide on epoxy for pin holes of Upper (North) OB. Apply epoxy and re-install mirror box in OB for installation. After receiving gold-plated screws, install in upper bar boxes and proceed with installing North OB
      • Replace mirrors on Lower (South) mirror box, re-anodize strong back and reapply new mirrors. Need to choose the same UV-enhanced or other first surface mirrors from previous tests.
        • Tests of separating test mirrors from aluminum piece already underway
  3. Spring 2019 DIRC Commissioning Analysis (All)
  4. Software/simulations
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  5. Software overview and tasks (All)
  6. AOB