Difference between revisions of "July 23, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 33: Line 33:
 
#* Commissioning LUT analyses (All)
 
#* Commissioning LUT analyses (All)
 
#**[https://web-docs.gsi.de/~rdzhigad/www/research/cherenkov-ring-fit Cherenkov ring fit] (Roman)  
 
#**[https://web-docs.gsi.de/~rdzhigad/www/research/cherenkov-ring-fit Cherenkov ring fit] (Roman)  
 +
#**[http://web-docs.gsi.de/~aali/ahmeddirc/pages/glx_cherenkov_DR_compare.html Cherenkov Systematics] (Ahmed)
 
#* Contributions to Jerry's DIRC review article (Yunjie, All)
 
#* Contributions to Jerry's DIRC review article (Yunjie, All)
 
# Software/simulations
 
# Software/simulations

Revision as of 12:31, 23 July 2019

Meeting Information

GlueX DIRC Meeting
Tuesday July 23, 2019
1:00 pm, EDT
JLab F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Installation work:
    • Mirror studies:
    • Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
    • Next steps:
      • Receive remaining UV enhanced mirror from Bates and have cut for additional sample pieces (Wednesday 7/24)
      • Decide on epoxy for pin holes of Upper (North) OB. Apply epoxy and re-install mirror box in OB for installation. After receiving gold-plated screws, install in upper bar boxes and proceed with installing North OB
      • Replace mirrors on Lower (South) mirror box, re-anodize strong back and reapply new mirrors. Need to choose the same UV-enhanced or other first surface mirrors from previous tests.
        • Tests of separating test mirrors from aluminum piece already underway
  3. Spring 2019 DIRC Commissioning Analysis (All)
  4. Software/simulations
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  5. Software overview and tasks (All)
  6. AOB