Difference between revisions of "July 24, 2015 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
Line 20: Line 20:
  
 
# Simulation update (Roman)
 
# Simulation update (Roman)
#* [http://web-docs.gsi.de/~rdzhigad/www/research/mirror-scan-gluex-dirc]
+
#* [http://web-docs.gsi.de/~rdzhigad/www/research/mirror-scan-gluex-dirc Mirror scan]
#* [http://web-docs.gsi.de/~rdzhigad/www/research/angle-scan-gluex-dirc]
+
#* [http://web-docs.gsi.de/~rdzhigad/www/research/angle-scan-gluex-dirc Angle scan]
 
# Focusing optics and mirror status (John)
 
# Focusing optics and mirror status (John)
 
# Mechanical structure and shipping crate (Matt)
 
# Mechanical structure and shipping crate (Matt)

Revision as of 08:38, 24 July 2015

Meeting Information

GlueX PID Upgrade Meeting
Friday, July 24, 2015
11 am, EDT
For those people at Jefferson Lab, the meeting will be in room F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  1. Simulation update (Roman)
  2. Focusing optics and mirror status (John)
  3. Mechanical structure and shipping crate (Matt)
  4. Readout (Justin)
  5. Planning for October review (All)
  6. AOB