Difference between revisions of "July 26, 2019 FCAL Insert Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
(14 intermediate revisions by the same user not shown)
Line 6: Line 6:
 
== Agenda ==
 
== Agenda ==
 
* Discuss 40x40 vs 32x32 crystal assembly
 
* Discuss 40x40 vs 32x32 crystal assembly
** 32x32 crystal matrix layout  [[Media:32x32_crystal_matrix_2D_layout]]
+
** 32x32 crystal matrix layout  [[Media:32x32_crystal_matrix_2D_layout.pdf]]
* ESH&Q minute -   https://misportal.jlab.org/ll/index.jsf?function=view&lessonId=790
+
** 40x40 crystal matrix layout  [[Media:40x40_crystal_matrix_2D_layout.pdf]]
* Open enrollment for insurance now Training this morning
+
** Decision to pre-measure stacks of crystals and the existing FCAL to determine bottom row offsets
* Open House May 17
+
** Shimming of row above crystals may be needed
* Accelerator achieved 2.2Gev for 1 pass
+
* Discuss installing Rohacel US of crystals to fill hole and support the lead glass blocks
* Montage https://www.jlab.org/montage/necessity
+
** Rohacel properties  [[Media:Rohacel cut sheet.pdf]]
* Restructure feedback to/from Mont at Physics staff mtg
+
** Radiation Hardness https://p25ext.lanl.gov/phenix/mvd/notes/1997/PHENIX-MVD-97-5/radiation.html
** Process performed in 1 day for safety of people and equipment
+
** http://www.phenix.bnl.gov/WWW/publish/bosze/phenixnote272/radiation.html  (same data)
** Accomplished to set lab in good position for future
+
* Discuss Tungsten absorber
** Flat budget next year and maybe COL increases following years
+
** How many crystals does it cover?
** Determined based on needed positions then merit
+
** How to support it and the blocks above
** People were concerned that media release did not address the value of the people layed off
+
* Monitoring System
** considered overall lab needs for final decisions
+
** Is acrylic sheet good enough for crystals?
* Solenoid improvements/corrections/schedule
+
* How were original FCAL lead glass modules stacked?
* NX
+
** Matt Shepherd stated that they were rotated 90 degrees every other one and bottom row was shimmed as required.
* Hall Schedule  [[Media:Hall D Sched Feb 2014.pdf]]
+
** What should the shim material be
 +
* 3D Screenshots
 +
** Overall Iso View Sept 2018 [[Media:Iso.png]]
 +
** Cooling Iso View Sept 2018 [[Media:Cooling Iso.jpg]]
 +
** Cooling-compression Plate Iso View Sept 2018 [[Media:Cooling-compression Iso.jpg]]
 +
 
 +
== Decisions/Action items ==
 +
* We will go with the 40x40 matrix for the design, we will have to shim if the install changes to 32x32
 +
* Need to define rohacell
 +
* Need to define monitoring system
 +
* Need to define tungsten absorber geometry
 +
* Need to perform heat load calcs
 +
* Need to define cable management system
 +
* Need to define shim material

Latest revision as of 10:44, 30 July 2019

Meeting Time and Place

Friday July 26,2019 1pm At Jefferson Lab, room TED 2504

Agenda

Decisions/Action items

  • We will go with the 40x40 matrix for the design, we will have to shim if the install changes to 32x32
  • Need to define rohacell
  • Need to define monitoring system
  • Need to define tungsten absorber geometry
  • Need to perform heat load calcs
  • Need to define cable management system
  • Need to define shim material