(Agenda)
Line 9: Line 9:
 
** 40x40 crystal matrix layout  [[Media:40x40_crystal_matrix_2D_layout.pdf]]
 
** 40x40 crystal matrix layout  [[Media:40x40_crystal_matrix_2D_layout.pdf]]
 
** Decision to pre-measure stacks of crystals and the existing FCAL to determine bottom row offsets
 
** Decision to pre-measure stacks of crystals and the existing FCAL to determine bottom row offsets
 +
** Shimming of row above crystals may be needed
 
* Discuss installing Rohacel US of crystals to fill hole and support the lead glass blocks
 
* Discuss installing Rohacel US of crystals to fill hole and support the lead glass blocks
 
** Rohacel properties  [[Media:Rohacel cut sheet.pdf]]
 
** Rohacel properties  [[Media:Rohacel cut sheet.pdf]]

Revision as of 12:41, 29 July 2019

Meeting Time and Place

Friday July 26,2019 1pm At Jefferson Lab, room TED 2504

Agenda

  • Discuss 40x40 vs 32x32 crystal assembly
  • Discuss installing Rohacel US of crystals to fill hole and support the lead glass blocks
  • Discuss Tungsten absorber
    • How many crystals does it cover?
    • How to support it and the blocks above
  • Monitoring System
    • Is acrylic sheet good enough for crystals?
  • How were original FCAL lead glass modules stacked?
    • Matt Shepherd stated that they were rotated 90 degrees every other one and bottom row was shimmed as required.
    • What should the shim material be