Difference between revisions of "July 26, 2019 FCAL Insert Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 13: Line 13:
 
** Rohacel properties  [[Media:Rohacel cut sheet.pdf]]
 
** Rohacel properties  [[Media:Rohacel cut sheet.pdf]]
 
** Radiation Hardness https://p25ext.lanl.gov/phenix/mvd/notes/1997/PHENIX-MVD-97-5/radiation.html
 
** Radiation Hardness https://p25ext.lanl.gov/phenix/mvd/notes/1997/PHENIX-MVD-97-5/radiation.html
 +
** http://www.phenix.bnl.gov/WWW/publish/bosze/phenixnote272/radiation.html
 
* Discuss Tungsten absorber
 
* Discuss Tungsten absorber
 
** How many crystals does it cover?
 
** How many crystals does it cover?

Revision as of 10:43, 30 July 2019

Meeting Time and Place

Friday July 26,2019 1pm At Jefferson Lab, room TED 2504

Agenda

Decisions/Action items

  • We will go with the 40x40 matrix for the design, we will have to shim if the install changes to 32x32
  • Need to define rohacell
  • Need to define monitoring system
  • Need to define tungsten absorber geometry
  • Need to perform heat load calcs
  • Need to define cable management system
  • Need to define shim material