Difference between revisions of "July 27, 2012 Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 28: Line 28:
 
* Solenoid
 
* Solenoid
 
* Electrical status
 
* Electrical status
* Installation Schedule [[Media:LSD_Installation.pdf]]
+
* Installation Schedule [[Media:Tom's LSD.pdf]]
 
* Caleb's presentation
 
* Caleb's presentation
 
* Engineering tasks M:\halld_engineering\Manpower-schedule
 
* Engineering tasks M:\halld_engineering\Manpower-schedule
 
* Engineering tools folder M:\halld_engineering\engineering tools
 
* Engineering tools folder M:\halld_engineering\engineering tools

Revision as of 07:40, 27 July 2012

Friday July 27, 2012 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 428

Agenda

http://www.jlab.org/div_dept/train/index.html

  • CAD update
  • Manpower Media:12 GeV FY12 Semi-Monthly FTE's by Skill Mix 07-15-12.pdf
  • Document control
    • search only keyword works right
    • Search document number has to be exact
    • documents not released are shown
    • must redo search when moving on to next page
    • when hitting back, old cached page shows up
    • Approved documents do not show up under my approvals
    • less emails would be better
    • no approvals in signature block
    • can dwg name etc.. be filled out automatically?
  • Target
  • Detector gas systems
  • Solenoid
  • Electrical status
  • Installation Schedule Media:Tom's LSD.pdf
  • Caleb's presentation
  • Engineering tasks M:\halld_engineering\Manpower-schedule
  • Engineering tools folder M:\halld_engineering\engineering tools