Difference between revisions of "July 6, 2020 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 19: Line 19:
 
#* JLab MEDCON5 and planning for 6-week summer run (beginning July 27)
 
#* JLab MEDCON5 and planning for 6-week summer run (beginning July 27)
 
# DIRC startup plans for summer run (Bill, Justin, All)
 
# DIRC startup plans for summer run (Bill, Justin, All)
#* Access to Hall D on Tuesday to check dark cover and restart electronics
+
#* [[Hall_D_MEDCON5_Operations_Resumption_Status|Access to Hall D on Tuesday]] to check dark cover and restart electronics
 
# DIRC commissioning analyses and 2020 studies (All)
 
# DIRC commissioning analyses and 2020 studies (All)
 
#* Spring 2020 monitoring and data production status (Justin)
 
#* Spring 2020 monitoring and data production status (Justin)

Revision as of 12:53, 6 July 2020

Meeting Information

GlueX DIRC Meeting
Monday July 6, 2020
1:00 pm, EDT
Remote only

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
    • JLab MEDCON5 and planning for 6-week summer run (beginning July 27)
  2. DIRC startup plans for summer run (Bill, Justin, All)
  3. DIRC commissioning analyses and 2020 studies (All)
    • Spring 2020 monitoring and data production status (Justin)
      • Monitoring launch ver12 completed (10 files from each run): used to check time offsets by run and initial PID studies
        • Files being combined at /volatile/halld/home/jrsteven/RunPeriod-2019-11/offline_monitoring/ver12_pass07/hd_root.root
      • Monitoring launch ver14: TOF timing shifts not reflected in DIRC time offsets. Fix in CCDB (Justin)
      • Monitoring launch ver15 (upcoming): hopefully final monitoring of runs 71350-71727 which will be followed by production at NERSC
    • Geometric reconstruction update (Ahmed/Roman)
    • FastDIRC update (Yunjie)
    • Revisting Roman's track rotation scan?
  4. Follow-up on additional action items from workfest (All)
    • 100M event MC samples required for ρ and φ data/MC comparisons:
      • /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2pi_pass00.root
      • /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2k_pass00.root
  5. AOB