(Tentative Agenda)
(Items for followup from previous meeting(s))
Line 18: Line 18:
 
#* temperature stabilization (Tim and Fernando)
 
#* temperature stabilization (Tim and Fernando)
 
#* summing circuits for SiPMs (Fernando)
 
#* summing circuits for SiPMs (Fernando)
# Impact of gain variations on resolution (especially for summed SiPMs) (Elton)
+
# <strike> Impact of gain variations on resolution (especially for summed SiPMs) (Elton) </strike>
  
 
= Documents to Review=
 
= Documents to Review=

Revision as of 12:09, 8 July 2009

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Note: code changed 7/2/09

Items for followup from previous meeting(s)

  1. Procedure to avoid vaseline in Bcal fabrication needs to be approved.
  2. Resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
  3. Documentation on fiber first-article
  4. Review calibration procedures
  5. Update cost estimates
    • light guides (USM)
    • temperature stabilization (Tim and Fernando)
    • summing circuits for SiPMs (Fernando)
  6. Impact of gain variations on resolution (especially for summed SiPMs) (Elton)

Documents to Review

  1. Table matrix of Criteria for Bcal Readout

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. BCAL Fabrication (Zisis)
    • Contract status
  4. FCAL Update
    • MOU, sow (Elton, Matt)
  5. Simulations
  6. BCAL Readout
    1. Update from USM (Will)
  7. Bcal Readout Review (July 21)
    1. Reviewers: Stefano Miscetti (INFN) via video, Stepan Stepanyan (Hall B) and Howard Fenker (Hall C)
    2. Tentative schedule: July 10: pre-brief material, July 16: slides for presentations.
    3. Web page: []
  8. Other business

Minutes

Attendees: