Difference between revisions of "July 9, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting(s))
(Items for followup from previous meeting(s))
Line 10: Line 10:
 
=Items for followup from previous meeting(s)=
 
=Items for followup from previous meeting(s)=
 
# Procedure to avoid vaseline in Bcal fabrication needs to be approved.
 
# Procedure to avoid vaseline in Bcal fabrication needs to be approved.
# Resolution studies  
+
# Resolve shipping procedures for Baby Cal.
#* Study impact of inactive material at the end of BCAL on acceptance.
+
# <strike> Resolution studies  
 +
#* Study impact of inactive material at the end of BCAL on acceptance. (Mihajlo and Sasha) </strike>
 
# Documentation on fiber first-article
 
# Documentation on fiber first-article
 
# Review calibration procedures
 
# Review calibration procedures
Line 17: Line 18:
 
#* light guides (USM)
 
#* light guides (USM)
 
#* temperature stabilization (Tim and Fernando)
 
#* temperature stabilization (Tim and Fernando)
#* summing circuits for SiPMs (Fernando)
+
#* <strike> summing circuits for SiPMs (Fernando) </strike>
 
# <strike> Impact of gain variations on resolution (especially for summed SiPMs) (Elton) </strike>
 
# <strike> Impact of gain variations on resolution (especially for summed SiPMs) (Elton) </strike>
  

Revision as of 12:11, 8 July 2009

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Note: code changed 7/2/09

Items for followup from previous meeting(s)

  1. Procedure to avoid vaseline in Bcal fabrication needs to be approved.
  2. Resolve shipping procedures for Baby Cal.
  3. Resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance. (Mihajlo and Sasha)
  4. Documentation on fiber first-article
  5. Review calibration procedures
  6. Update cost estimates
    • light guides (USM)
    • temperature stabilization (Tim and Fernando)
    • summing circuits for SiPMs (Fernando)
  7. Impact of gain variations on resolution (especially for summed SiPMs) (Elton)

Documents to Review

  1. Table matrix of Criteria for Bcal Readout

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. BCAL Fabrication (Zisis)
    • Contract status
  4. FCAL Update
    • MOU, sow (Elton, Matt)
  5. Simulations
  6. BCAL Readout
    1. Update from USM (Will)
  7. Bcal Readout Review (July 21)
    1. Reviewers: Stefano Miscetti (INFN) via video, Stepan Stepanyan (Hall B) and Howard Fenker (Hall C)
    2. Tentative schedule: July 10: pre-brief material, July 16: slides for presentations.
    3. Web page: []
  8. Other business

Minutes

Attendees: