July 9, 2009 Calorimetry

From GlueXWiki
Revision as of 12:09, 8 July 2009 by Elton (Talk | contribs) (Items for followup from previous meeting(s))

Jump to: navigation, search

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Note: code changed 7/2/09

Items for followup from previous meeting(s)

  1. Procedure to avoid vaseline in Bcal fabrication needs to be approved.
  2. Resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
  3. Documentation on fiber first-article
  4. Review calibration procedures
  5. Update cost estimates
    • light guides (USM)
    • temperature stabilization (Tim and Fernando)
    • summing circuits for SiPMs (Fernando)
  6. Impact of gain variations on resolution (especially for summed SiPMs) (Elton)

Documents to Review

  1. Table matrix of Criteria for Bcal Readout

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. BCAL Fabrication (Zisis)
    • Contract status
  4. FCAL Update
    • MOU, sow (Elton, Matt)
  5. Simulations
  6. BCAL Readout
    1. Update from USM (Will)
  7. Bcal Readout Review (July 21)
    1. Reviewers: Stefano Miscetti (INFN) via video, Stepan Stepanyan (Hall B) and Howard Fenker (Hall C)
    2. Tentative schedule: July 10: pre-brief material, July 16: slides for presentations.
    3. Web page: []
  8. Other business

Minutes

Attendees: