Difference between revisions of "July 9, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 18: Line 18:
 
# Announcements
 
# Announcements
 
# Installation work:
 
# Installation work:
 +
#* Tests of composition from oxidized surfaces (Eugene)
 
#* Mirror cleaning: (Greg)
 
#* Mirror cleaning: (Greg)
 
#** [https://logbooks.jlab.org/entry/3694386 Initial cleaning with Isopropyl]
 
#** [https://logbooks.jlab.org/entry/3694386 Initial cleaning with Isopropyl]
 
#** [https://logbooks.jlab.org/entry/3700715 Current status after initial Hastilite cleaning]
 
#** [https://logbooks.jlab.org/entry/3700715 Current status after initial Hastilite cleaning]
#** Further cleaning options: Hastilite with mirror strongback disassembled
+
#** Further cleaning options:  
#* Epoxy test sample: Logbook entries (Bill, All)
+
#*** Disassemble mirror strongback for better access and try further cleaning with Hastilite
#** Aluminum optical fiber brackets: 7 brackets being sent out for anodizing this week
+
#*** Place mirror assembly in water (fish tank?) and evaluate effect on reflectivity underwater
#** [https://logbooks.jlab.org/entry/3693215 Cleaning mirrors] (Greg)
+
#* Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
#** Test epoxy to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
+
#** 7/1: [https://logbooks.jlab.org/entry/3697224 Initiate test]
#*** 7/1: [https://logbooks.jlab.org/entry/3697224 Initiate test]
+
#** 7/3: [https://logbooks.jlab.org/entry/3698479 First water changeout, no issues]
#*** 7/3: [https://logbooks.jlab.org/entry/3698479 First water changeout, no issues]
+
#** 7/5: [https://logbooks.jlab.org/entry/3698889 Second water changeout, no issues]
#*** 7/5: [https://logbooks.jlab.org/entry/3698889 Second water changeout, no issues]
+
#** 7/8: [https://logbooks.jlab.org/entry/3700442 Damage from contact between SS plate and mirror surface]
#*** 7/8: [https://logbooks.jlab.org/entry/3700442 Damage from contact between SS plate and mirror surface]
+
#* Next steps:
 +
#** Next week: decide on epoxy for pin holes of Upper (North) OB.  Apply epoxy and re-install mirror box in OB for installation
 +
#** 2 weeks: after receiving gold-plated screws, install in upper bar boxes and proceed with installing North OB
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
#* Reconstruction with FastDIRC (Yunjie)
 
#* Reconstruction with FastDIRC (Yunjie)
#* LUT improvements (Roman)
+
#* Commissioning LUT analyses (Ahmed/Roman)
#* Commissioning analyses (Ahmed)
+
#* Contributions to Jerry's DIRC review article (Yunjie, All)
 
# Software/simulations
 
# Software/simulations
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
 
 
#* FastDIRC geometry implementation and alignment work (Cris/Yunjie)
 
#* FastDIRC geometry implementation and alignment work (Cris/Yunjie)
 
# Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
# Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
# AOB
 
# AOB

Revision as of 07:40, 9 July 2019

Meeting Information

GlueX DIRC Meeting
Tuesday July 9, 2019
1:00 pm, EDT
JLab F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Installation work:
  3. Spring 2019 DIRC Commissioning Analysis (All)
    • Reconstruction with FastDIRC (Yunjie)
    • Commissioning LUT analyses (Ahmed/Roman)
    • Contributions to Jerry's DIRC review article (Yunjie, All)
  4. Software/simulations
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  5. Software overview and tasks (All)
  6. AOB