#** Further cleaning options:  
 
#** Further cleaning options:  
 
#*** Disassemble mirror strongback for better access and try further cleaning with Hastilite
 
#*** Disassemble mirror strongback for better access and try further cleaning with Hastilite
#*** Relative reflectivity measurement for areas with discoloration and residue
+
#*** Relative reflectivity measurement for areas with discoloration and residue [https://halldweb.jlab.org/DocDB/0035/003581/002/DIRC_meeting_9_July_2019.pdf Bill]
 
#*** Place mirror assembly in water (fish tank?) and evaluate effect of discoloration on reflectivity underwater
 
#*** Place mirror assembly in water (fish tank?) and evaluate effect of discoloration on reflectivity underwater
 
#* Tests of composition from oxidized surfaces (Eugene)
 
#* Tests of composition from oxidized surfaces (Eugene)
 
#* Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
 
#* Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
#** 7/1: [https://logbooks.jlab.org/entry/3697224 Initiate test]
+
#** 7/1: [https://logbooks.jlab.org/entry/3697224 Initiate tests]
 
#** 7/3: [https://logbooks.jlab.org/entry/3698479 First water changeout, no issues]
 
#** 7/3: [https://logbooks.jlab.org/entry/3698479 First water changeout, no issues]
 
#** 7/5: [https://logbooks.jlab.org/entry/3698889 Second water changeout, no issues]
 
#** 7/5: [https://logbooks.jlab.org/entry/3698889 Second water changeout, no issues]
Line 37: Line 37:
 
#** 2 weeks: after receiving gold-plated screws, install in upper bar boxes and proceed with installing North OB
 
#** 2 weeks: after receiving gold-plated screws, install in upper bar boxes and proceed with installing North OB
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
#* Reconstruction with FastDIRC (Yunjie)
+
#* [https://halldweb.jlab.org/wiki/images/2/2d/Tracking_DIRC_alignment.pdf Tracking-DIRC alignment study] (Yunjie)
#* Commissioning LUT analyses (Ahmed/Roman)
+
#* Commissioning LUT analyses (Ahmed/Roman) | [http://web-docs.gsi.de/~aali/ahmeddirc/pages/glx_sys_distribution.html Reconstructed Cherenkov angle Systematics]
 
#* Contributions to Jerry's DIRC review article (Yunjie, All)
 
#* Contributions to Jerry's DIRC review article (Yunjie, All)
 
# Software/simulations
 
# Software/simulations

Latest revision as of 12:50, 9 July 2019

Meeting Information

GlueX DIRC Meeting
Tuesday July 9, 2019
1:00 pm, EDT
JLab F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Installation work:
  3. Spring 2019 DIRC Commissioning Analysis (All)
  4. Software/simulations
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  5. Software overview and tasks (All)
  6. AOB