Difference between revisions of "July 9, 2019 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Tuesday July 9, 2019<br> 1:00 pm, EDT<br> JLab F326 <br> == Connection Using Bluejeans == # To join via Polycom room system...") |
(→Agenda) |
||
Line 19: | Line 19: | ||
# Installation work: | # Installation work: | ||
#* Mirror cleaning: | #* Mirror cleaning: | ||
− | #** Logbook entries: | + | #** Logbook entries: [https://logbooks.jlab.org/entry/3693215 Status last meeting], ... (Greg) |
#** Further cleaning options: Hastilite with mirror strongback disassembled | #** Further cleaning options: Hastilite with mirror strongback disassembled | ||
#* Epoxy test sample: Logbook entries (Bill, All) | #* Epoxy test sample: Logbook entries (Bill, All) |
Revision as of 15:47, 8 July 2019
Meeting Information
GlueX DIRC Meeting
Tuesday July 9, 2019
1:00 pm, EDT
JLab F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Installation work:
- Mirror cleaning:
- Logbook entries: Status last meeting, ... (Greg)
- Further cleaning options: Hastilite with mirror strongback disassembled
- Epoxy test sample: Logbook entries (Bill, All)
- Aluminum optical fiber brackets: 7 brackets being sent out for anodizing this week
- Cleaning mirrors (Greg)
- Test epoxy to prevent corrosion of exposed aluminum surfaces (Tim/All)
- Mirror cleaning:
- Spring 2019 DIRC Commissioning Analysis (All)
- Reconstruction with FastDIRC (Yunjie)
- LUT improvements (Roman)
- Commissioning analyses (Ahmed)
- Software/simulations
- Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB