Difference between revisions of "July 9, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 18: Line 18:
 
# Announcements
 
# Announcements
 
# Installation work:
 
# Installation work:
#* Mirror cleaning:
+
#* Mirror cleaning: (Greg)
#** Logbook entries: [https://logbooks.jlab.org/entry/3693215 Status last meeting], ... (Greg)
+
#** [https://logbooks.jlab.org/entry/3694386 Initial cleaning with Isopropyl]
 +
#** [https://logbooks.jlab.org/entry/3700715 Current status after initial Hastilite cleaning]
 
#** Further cleaning options: Hastilite with mirror strongback disassembled  
 
#** Further cleaning options: Hastilite with mirror strongback disassembled  
 
#* Epoxy test sample: Logbook entries (Bill, All)
 
#* Epoxy test sample: Logbook entries (Bill, All)
 
#** Aluminum optical fiber brackets: 7 brackets being sent out for anodizing this week
 
#** Aluminum optical fiber brackets: 7 brackets being sent out for anodizing this week
 
#** [https://logbooks.jlab.org/entry/3693215 Cleaning mirrors] (Greg)
 
#** [https://logbooks.jlab.org/entry/3693215 Cleaning mirrors] (Greg)
#** Test epoxy to prevent corrosion of exposed aluminum surfaces (Tim/All)
+
#** Test epoxy to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
 +
#*** 7/1: [https://logbooks.jlab.org/entry/3697224 Initiate test]
 +
#*** 7/3: [https://logbooks.jlab.org/entry/3698479 First water changeout, no issues]
 +
#*** 7/5: [https://logbooks.jlab.org/entry/3698889 Second water changeout, no issues]
 +
#*** 7/8: [https://logbooks.jlab.org/entry/3700442 Damage from contact between SS plate and mirror surface]
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
#* Reconstruction with FastDIRC (Yunjie)
 
#* Reconstruction with FastDIRC (Yunjie)

Revision as of 07:32, 9 July 2019

Meeting Information

GlueX DIRC Meeting
Tuesday July 9, 2019
1:00 pm, EDT
JLab F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Installation work:
  3. Spring 2019 DIRC Commissioning Analysis (All)
    • Reconstruction with FastDIRC (Yunjie)
    • LUT improvements (Roman)
    • Commissioning analyses (Ahmed)
  4. Software/simulations
    • Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  5. Software overview and tasks (All)
  6. AOB