# Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories. | # Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories. | ||
+ | # Jim will order the mechanical cover so that the Lemo connections can be checked for rigidity | ||
+ | # | ||
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 17:16, 26 May 2011
References
Action Items from previous meetings
- Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories.
- Jim will order the mechanical cover so that the Lemo connections can be checked for rigidity
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM testing (Carl and Yi)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Geometry (Elton)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
Minutes
Attending: