Jun 26, 2012 Readout

From GlueXWiki
Revision as of 15:07, 26 June 2012 by Elton (Talk | contribs) (Minutes)

Jump to: navigation, search

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US and Canada
    • +1-303-248-0285 : International
    • then use participant code: 3421244# (the # is needed when using the phone)
    • OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting

  1. SiPMs
    • Investigate the optimum overbias setting for the SiPMs (Serguei and Orlando)

Presentations from recent meetings

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update from Athens: monitoring
  4. Update from USM
  5. Status of testing at JLab
    1. Hall-D ELOG.
  6. Status of work at Regina
    1. BCAL Beam Tests 2012: Analysis & Simulations (Andrei & Irina)
    2. BCAL Cosmics at Regina
  7. Other

Minutes

Attending: Elton, Beni, David, John, Ben, Yi, Tim (Jlab); Will, Javiera, Orlando, Iñaki (USM); Zisis, Andrei (UofR); Christina, George, Stratos (Athens)

  1. Announcements
    • Students (and Zisis) from UofR arrive on July 9
  2. Review of Action Items
  3. Update from Athens: monitoring
    1. SiPMs for testing. One in regular mail (needs to be tracked down) and 3 to be hand-carried by George
    2. Orders
      • Requests have been made, but little response.
  4. Update from USM
    1. SiPM Update (Javiera)
      • Fourth shipment from Hamamatsu arrived on June 20
      • All units from first three shipments completed in stage 3. Starting to test 4th shipment
      • 265 units PDE measured in stage 2. 15 more required to complete all measurements
      • Zisis: request a summary table from Javiera during update.
    2. Discussion on what information must be provided on the tested SiPMs
      • Will: Suggestion to provide a dump of the data base for each shipment delivered. Note that this is simply a snapshot in time that can change when analyses are updated.
      • Consider various options for concise summaries also.
      • Yi: JLab has three tables a) specification and Hamamatsu data b) All run information and raw data c) summary of measurements
      • Failed units: one from USM with a dead channel, one from JLab that fails to meet one of the specifications.
    3. Contract and pulse shape
      • Pulse shape measurements are dominated by the response of the JLab preamps. Is is worth doing these systematically
      • Elton: Checking signals on scope can be very informative.
    4. Revisiting the dark current measurements (Orlando)
      • The dark current measurements seem to be low. Data have been taken with the oscilloscope to cross check the measurements (in progress).
    5. Light guides
  5. Status of testing at JLab
    1. Hall-D ELOG.
  6. Status of work at Regina
    1. BCAL Beam Tests 2012: Analysis & Simulations (Andrei & Irina)
    2. BCAL Cosmics at Regina
  7. Other