Difference between revisions of "Jun 4, 2009 Readout"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting)
(Items for followup from previous meeting)
Line 9: Line 9:
  
 
=Items for followup from previous meeting=
 
=Items for followup from previous meeting=
# <strike> Check arrival of Bcal section from Edmonton <strike>
+
# <strike> Check arrival of Bcal section from Edmonton </strike>
 
# Will to propose detailed plan for prototyping for feedback. Sketch of test setup could help visualization.
 
# Will to propose detailed plan for prototyping for feedback. Sketch of test setup could help visualization.
 
# <strike> Elton to provide reference light guide geometry for GEANT3. </strike>
 
# <strike> Elton to provide reference light guide geometry for GEANT3. </strike>

Revision as of 17:42, 3 June 2009

Teleconference Time: 11:00 a.m. EST

  • EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting

  1. Check arrival of Bcal section from Edmonton
  2. Will to propose detailed plan for prototyping for feedback. Sketch of test setup could help visualization.
  3. Elton to provide reference light guide geometry for GEANT3.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. USM report
  4. Discussion of readout options
    • Budgets
    • Specifications (See GlueX-doc-1287)
    • FM light guides
    • Mechanical keep-out zones
    • Timeline for review - Reviewer Stefano Miscetti (tentative July 21)
  5. Prototyping
  6. Simulations
    • Sasha will send a link to studies of energy deposition in the Bcal and present his work next time.
    • Andrei will complete simulations of number of visible photons per GeV.
  7. Discussions on MOU with USM

Minutes