Difference between revisions of "June 1,2020 Tech group meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Ongoing Activities)
Line 24: Line 24:
  
 
== Ongoing Activities ==
 
== Ongoing Activities ==
* On Call Activity -- issues with alarm system, Solenoid US VCL flow alarms
+
* On Call Activity -- HD refrigerator compressor trip https://logbooks.jlab.org/book/hdlog
 
* Updates
 
* Updates
** Josh -- Review Resumption Documentation training tagger window replacement
+
** Josh --  
** Stephanie --  CPP Redesign for alignment, CAD
+
** Stephanie --  CPP  
** Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps
+
** Keith -- Vacuum training  
** Bobby -- DIRC Dark Box and Mirror Box Install CAD, 3D printing, P&ID
+
** Bobby --  
** Chris -- Welding, Training
+
** Chris --  
 
** Nick -- power supply temp/Flow readings
 
** Nick -- power supply temp/Flow readings
 
* Help desk still live -- 269-7155
 
* Help desk still live -- 269-7155

Revision as of 08:03, 1 June 2020

Meeting Time and Place

Monday June 1, 2020 at 9am Bluejeans https://bluejeans.com/835373169

Agenda

  • JLAB MEDCON5 Transition Updates https://www.jlab.org/memo/medcon-5-transition-updates
  • Jlab Update - May go to MEDCON5 June 5 or June 8 (If approved by DOE)
  • Some important points to consider are:
    • We will only come back in Tiers. People will be requested to come in by the Work Coordinator. All work must be reviewed and approved by the Work Coordinator.
    • Essential work is preparation for CEBAF/experiment operations, needed planning work for the scheduled accelerator down, whatever we get judged on by DOE/SC and work related to quality assurance of procurements, etc. No default work operations
    • About 200 JLAB employees will be allowed back on site during MEDCON5 phased in over 2 weeks
    • Request for deviation of DOE PHE charge rules has been submitted. This will affect return planning and work from home
    • Employee supplied cloth face masks required during MEDCON5 in any area where multiple people are
    • Social distancing (6 ft min) required on all work unless AD approved and proper PPE
  • Resumption Plan - Mark
  • Resumption Schedule - Scot

Action Items

  • Update/Approve Resumption plan
  • Review all procedures - in work - Mark/Scot

Ongoing Activities

  • On Call Activity -- HD refrigerator compressor trip https://logbooks.jlab.org/book/hdlog
  • Updates
    • Josh --
    • Stephanie -- CPP
    • Keith -- Vacuum training
    • Bobby --
    • Chris --
    • Nick -- power supply temp/Flow readings
  • Help desk still live -- 269-7155
  • Service now for issues - https://jlab.servicenowservices.com/nav_to.do?uri=%2Fhome.do%3F
  • Daily work
    • Send a daily check in email response to the group
    • Complete any training that is due within the next 4 months
    • Do any online training that may be available
    • Update documentation you are responsible for and are able to do from home
    • Familiarize with Bluejeans and attend meetings as required
    • Check Web EDM (CSS) screens periodically (daily)
    • Check HDLOG daily and respond as needed.
    • All must be available during working hours
    • If you are going out of town, notify supervisor and charge vacation
    • If you are sick, notify supervisor and charge sick time
    • Charge HDOPS for the actual time spent on above activities
    • Charge Public Health Emergency for the remainder of hours up to 8 per day and 40 per week max.
    • Fill out timesheets daily
  • Anything else?