Difference between revisions of "June 11, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting(s))
(Tentative Agenda)
Line 27: Line 27:
 
# Simulations
 
# Simulations
 
# BCAL Fabrication
 
# BCAL Fabrication
#* Contract (George)
+
#* Contract status
#* Preparations for construction (Zisis)
+
#* Construction prototype update
 
#* Report on First-article fibers (Zisis)
 
#* Report on First-article fibers (Zisis)
#** March: [[Kuraray Fibre Tests| Kuraray Fibre Tests - March 19, 2009]]
 
#** This week: [[Media:FiberAtten-20090528.pdf]]
 
 
# BCAL Readout
 
# BCAL Readout
#* [http://www.jlab.org/~brooksw/Report28May2009.pdf Update] from USM (Will)
+
#* Update from USM (Will)
#* Readout specifications using SiPMs (Fernando)
+
#* Rates in the BCAL (Sasha)
#* Rates in the BCAL [http://www.jlab.org/~somov/bcal_cur.ppt] (Sasha) and [http://www.jlab.org/~zihlmann/BCAL/ Beni]
+
#* Budget comparisons (Elton)
#* Light guide efficiency for FM PMTs ([http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1279 GlueX-doc-1279 pp 12-19]) (Elton)
+
#* Review of readout options (tentative July 21) discussion
#* Review of readout options (tentative July 14) discussion
+
  
 
=Minutes=
 
=Minutes=

Revision as of 08:55, 10 June 2009

Teleconference Time: 11:00 a.m. EST

  • EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting(s)

  1. Resolution studies
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
  2. Documentation on fiber first-article
  3. Review calibration procedures
  4. Will: Noted from CLAS experience both oxides and carbonates can accumulate on lead. One type is worse than the other (will send references to UofR)
  5. Elton will check on fiber delivery and comments from Kuraray on material for storage of fibers.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. FCAL Update
  5. Simulations
  6. BCAL Fabrication
    • Contract status
    • Construction prototype update
    • Report on First-article fibers (Zisis)
  7. BCAL Readout
    • Update from USM (Will)
    • Rates in the BCAL (Sasha)
    • Budget comparisons (Elton)
    • Review of readout options (tentative July 21) discussion

Minutes