Difference between revisions of "June 11, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting(s))
(Tentative Agenda)
Line 24: Line 24:
 
# Calibration
 
# Calibration
 
# FCAL Update
 
# FCAL Update
# Simulations
 
 
# BCAL Fabrication
 
# BCAL Fabrication
 
#* Contract status
 
#* Contract status
 
#* Construction prototype update  
 
#* Construction prototype update  
#* Report on First-article fibers (Zisis)
 
 
# BCAL Readout
 
# BCAL Readout
 
#* Update from USM (Will)
 
#* Update from USM (Will)
#* Rates in the BCAL (Sasha)
 
 
#* Budget comparisons (Elton)
 
#* Budget comparisons (Elton)
 
#* Review of readout options (tentative July 21) discussion
 
#* Review of readout options (tentative July 21) discussion
 +
# Simulations (Sasha)
  
 
=Minutes=
 
=Minutes=

Revision as of 08:57, 10 June 2009

Teleconference Time: 11:00 a.m. EST

  • EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from previous meeting(s)

  1. Resolution studies
    • Study impact of inactive material at the end of BCAL on acceptance.
  2. Documentation on fiber first-article
  3. Review calibration procedures
  4. Will: Noted from CLAS experience both oxides and carbonates can accumulate on lead. One type is worse than the other (will send references to UofR)
  5. Elton will check on fiber delivery and comments from Kuraray on material for storage of fibers.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. FCAL Update
  5. BCAL Fabrication
    • Contract status
    • Construction prototype update
  6. BCAL Readout
    • Update from USM (Will)
    • Budget comparisons (Elton)
    • Review of readout options (tentative July 21) discussion
  7. Simulations (Sasha)

Minutes