Difference between revisions of "June 11, 2021 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 20: Line 20:
 
#* [https://logbooks.jlab.org/entry/3878979 Latest inspections of mirror prototypes] (Bill)
 
#* [https://logbooks.jlab.org/entry/3878979 Latest inspections of mirror prototypes] (Bill)
 
#* [https://logbooks.jlab.org/entry/3879783 Mirror production progress] (Justin)
 
#* [https://logbooks.jlab.org/entry/3879783 Mirror production progress] (Justin)
 +
#* [https://halldweb.jlab.org/DocDB/0035/003581/005/2021_June_11_Diffuser_pattern_check.pdf Diffuser Pattern Check] (Bill)
 
# DIRC commissioning analyses and 2020 studies (All)
 
# DIRC commissioning analyses and 2020 studies (All)
 
#* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring 2020 data production status] (Justin)
 
#* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring 2020 data production status] (Justin)

Revision as of 09:03, 11 June 2021

Meeting Information

GlueX DIRC Meeting
Friday June 11, 2021
10:00 am, ET
Remote only

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Mirror prototype test plan (All)
  3. DIRC commissioning analyses and 2020 studies (All)
  4. AOB