Difference between revisions of "June 14, 2018 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 19: Line 19:
 
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25]
 
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25]
 
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-June-2018 Collaboration meeting June 21-23]
 
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-June-2018 Collaboration meeting June 21-23]
# Support structure update (Tim, Mark)
+
# Bar box transportation and installation (Tim, Mark)
 +
#* [https://mailman.jlab.org/pipermail/halld-pid-upgrade/2018-June/000359.html Notes from the road] (Matt)
 +
#* Lessons learned for upper bar box installation (Tim)
 
# Optical box
 
# Optical box
 
#*Status update (Ernie and Jason)
 
#*Status update (Ernie and Jason)
Line 26: Line 28:
 
#** Window procurement
 
#** Window procurement
 
#** Dark box conceptual design
 
#** Dark box conceptual design
 +
#* Installation schedule
 
# Simulation studies (Maria and Roman)
 
# Simulation studies (Maria and Roman)
 
# MAPMT testing (Bill)
 
# MAPMT testing (Bill)
 
# AOB
 
# AOB

Revision as of 12:29, 13 June 2018

Meeting Information

GlueX DIRC Meeting
Thursday June 14, 2018
10:00 am, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Bar box transportation and installation (Tim, Mark)
  3. Optical box
    • Status update (Ernie and Jason)
      • Box production at Lesker
      • PMT test fixture and cookies (Maria)
      • Window procurement
      • Dark box conceptual design
    • Installation schedule
  4. Simulation studies (Maria and Roman)
  5. MAPMT testing (Bill)
  6. AOB