Difference between revisions of "June 15, 2012 Design Meeting"
From GlueXWiki
(Created page with "Friday June 15, 2012 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231 == Agenda == * ESH&Q minutes - ? * Announcements ** John Conger ** Project extended to...") |
(→Agenda) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
== Agenda == | == Agenda == | ||
− | * ESH&Q minutes - | + | * ESH&Q minutes - Rich |
* Announcements | * Announcements | ||
** John Conger | ** John Conger | ||
** Project extended to Sept 2014 (was April 2014) | ** Project extended to Sept 2014 (was April 2014) | ||
+ | ** Manpower - Hall B magnets/TOF needs tech and designer help[[Media:Halld_manpower.pdf]] | ||
+ | ** New Hall work governance document - next week | ||
* CAD update | * CAD update | ||
* Tagger Magnet update | * Tagger Magnet update | ||
+ | * Solenoid | ||
* Infrastructure update | * Infrastructure update | ||
* Electrical status | * Electrical status | ||
+ | * Fabrication/Installation status | ||
* Joseph Accolla - Hall D SiPm test box | * Joseph Accolla - Hall D SiPm test box | ||
* Installation Schedule [[Media:LSD_Installation.pdf]] | * Installation Schedule [[Media:LSD_Installation.pdf]] |
Latest revision as of 08:43, 15 June 2012
Friday June 15, 2012 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231
Agenda
- ESH&Q minutes - Rich
- Announcements
- John Conger
- Project extended to Sept 2014 (was April 2014)
- Manpower - Hall B magnets/TOF needs tech and designer helpMedia:Halld_manpower.pdf
- New Hall work governance document - next week
- CAD update
- Tagger Magnet update
- Solenoid
- Infrastructure update
- Electrical status
- Fabrication/Installation status
- Joseph Accolla - Hall D SiPm test box
- Installation Schedule Media:LSD_Installation.pdf
- Engineering tasks M:\halld_engineering\Manpower-schedule
- Engineering tools folder M:\halld_engineering\engineering tools