Difference between revisions of "June 17, 2016 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 19: Line 19:
 
# Announcements
 
# Announcements
 
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2996 Bar box shipping document] sent to Jerry, Blair and JLab management (John and Matt)
 
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2996 Bar box shipping document] sent to Jerry, Blair and JLab management (John and Matt)
 +
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=3070 DIRC2015 Proceedings]
 
# Optical box design update (MIT)
 
# Optical box design update (MIT)
 
#* [https://gluexdirc.mit.edu/window-material Window material study] (Maria)
 
#* [https://gluexdirc.mit.edu/window-material Window material study] (Maria)
Line 24: Line 25:
 
# [https://gluexdirc.mit.edu/expected-distributions Expected Occupancies] (John H)
 
# [https://gluexdirc.mit.edu/expected-distributions Expected Occupancies] (John H)
 
# [https://halldweb.jlab.org/wiki/index.php/File:FIFTH_DISCUSSION.pptx Support structure design update (IU)]
 
# [https://halldweb.jlab.org/wiki/index.php/File:FIFTH_DISCUSSION.pptx Support structure design update (IU)]
 +
# Preliminary discussion of CUA contributions (Greg)
 
# [[DIRC Planning for FY16|Planning for FY16]]
 
# [[DIRC Planning for FY16|Planning for FY16]]
 
# AOB
 
# AOB

Revision as of 10:42, 17 June 2016

Meeting Information

GlueX PID Upgrade Meeting
Friday, June 3, 2016
11 am, EDT
JLab room F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Optical box design update (MIT)
  3. Expected Occupancies (John H)
  4. Support structure design update (IU)
  5. Preliminary discussion of CUA contributions (Greg)
  6. Planning for FY16
  7. AOB